A small update for today. This week I've been working on a bunch of models, but due to the weather I have not been able to varnish them outside and finish them off. As such, I've started working on a card LNWR signal box kit from Metcalfe.
The signal box is coming on well, but I would like to put an interior in the top floor, due to the large windows. This requires another kit, which is currently in the post. However I have managed to get the Lineside Hut and the Fuel Store for this kit completed. The card kits goes together well however. I have painted the bare card edges (largely with Basilicanum Grey Contrast Paint and Vallejo Terracotta) for better realism.
No comments:
Post a Comment